This is the compatibility page for the kehua

Follow the installation manuals provided by the manufacturer. Use the quick user guide “SMD_HVxxxx/SMD_LV2/Kehua_BCS_00” and “SMD_LV2/Kehua_BTS_00” detailing the connection of the communication cables.

Commissioning

If a BCS cabinet is installed, it is required to verify the electrical connection between grid and the voltage sense connector in the inverter.

To do this:

  1. Switch grid ON
  2. Switch the grid breaker on the BTS cabinet ON
  3. Measure AC voltage between the inverter AC busbar and the voltage sense connectors.

The values should be as below:

BCS busbar Voltage sense connector Voltage (V)
U U 0V
U V 400V
U W 400V
V U 400V
V V 0V
V W 400V
W U 400V
W V 400V
W W 0V

Now that the cable order has been verified, you may proceed with commissioning.

Note: In grid-tied mode, the inverter may display a *phase rotation error*. Should this occur, one grid phase needs to be swapped until the error disappears. Repeat this test after swapping any AC cable.

Enter settings, type in the inverter password from Kehua. navigate to GRID PROTECT PARAMETERS, and change the following settings to match the below.

Parameter Value
Undervolt.Recover (%) 96.0
Overvolt.Recover (%) 110.0
Underfreq.Recover (Hz) 49.50
Overfreq.Recover (Hz) 50.50
Volt (%) Parameter Value Time (s)
Undervolt.L1 94.0 1.40
Undervolt.L2 94.0 1.40
Overvolt.L1 110.0 3.00
Overvolt.L2 115.0 0.15
Overvolt.L3 115.0 0.15
Freq (Hz) Parameter Value Time (s)
Underfreq.L1 47.50 0.40
Underfreq.L2 47.50 0.40
Overfreq.L1 52.00 0.40
Overfreq.L2 52.00 0.40
Other Parameter Value
10 Min OverVoltProT 1.100

Discussion

masud sonday, 2025/05/12 18:17

follow the installation manuals provided by the manufacturer. Use the quick user guide “SMD_HVxxxx/SMD_LV2/Kehua_BCS_00” and “SMD_LV2/Kehua_BTS_00” detailing the connection of the communication cables.

Commissioning

If a BCS cabinet is installed, it is required to verify the electrical connection between grid and the voltage sense connector in the inverter. to do this, switch grid ON, switch the grid breaker on the BTS cabinet ON. measure AC voltage between the inverter AC busbar and the voltage sense connectors. The values should be as below.

masud sonday, 2025/05/12 18:22, 2025/05/12 18:23

BCS busbar Voltage sense connector U - U = 0V U - V = 400V U - W = 400V V - U = 400V V - V = 0V V - W = 400V W - U = 400V W - V = 400V W - W = 0V

masud sonday, 2025/05/12 18:26

now that the cable order has been verified, you may proceeed with commissioning. Note, in grid tied mode, the inverter may display a phase rotation error. should this occur, 1 grid phase needs to be swapped until the error disappears. Repeat this test after swapping any AC cable.

You could leave a comment if you were logged in.
Previous Next

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap

Page Tools

  • Show pagesource
  • Old revisions
  • Backlinks
  • Back to top

User Tools

  • Log In
products/high_voltage/compatibility/kehua.txt · Last modified: 2025/05/16 17:54 by masud
wiki

Table of Contents

  • bms-ex
  • old
  • products
  • services